Advancing Toward VEDP Tier 4
Praetorian Park is approaching VEDP Tier 4 readiness. Substantial diligence and planning work has been advanced, while pad-specific borings, final grading, utility coordination and construction, site-activation sequencing, and other project-specific work remain. Tier 5 shovel-ready status is the target—not the current condition.
Where the Site Stands Today
Development readiness is tracked by status so partners can distinguish confirmed work, active diligence, and future planning.
- Single-owner site assembly4,041 contiguous acres · no parcel fragmentation
- Confirmed zoning zoning confirmedIndustrial and data uses permitted by right · City of Chesapeake
- Phase I environmental review in progressPhase II will be considered only if Phase I findings recommend it
- Phase 1 power planning activeUtility coordination and capacity diligence underway; no substation exists on site today
- Fiber provider pathway identified; carriers, routes, agreements, and timing require confirmationZayo · Lumen · Crown Castle · Comcast Enterprise
- Floodplain mapping available for diligence reviewBuildable areas and elevations require project-specific confirmation
- Regional access associated with US-17 and Ballahack RoadHeavy-haul routes, load limits, entrances, and permits require confirmation
- Water and sewer extension engineering documentedCity-engineered extensions are planned; construction and commitments remain future steps
- Phase 2 power planningPlanned; scope and schedule will follow Phase 1 requirements
- On-site generation feasibilityGas / SMR / renewable hybrid · study phase
A Phased Path to 5+ GW Potential
Praetorian Park is planned for phased growth as a green mixed-use employment campus. Power, utilities, access, and site improvements will be sequenced with tenant demand.
Infrastructure will follow phased demand
Phase 1 is the active planning priority. Phase 2 is planned and will be advanced when supported by Phase 1 requirements, tenant demand, engineering, and utility coordination.
Indicative Development Schedule
Representative timeline from NDA to energization for a Phase 1 deployment. Actual schedule depends on operator configuration and build-out scope.
- By-right zoning for industrial and data usesA discretionary rezoning vote is not required for allowed uses; other approvals remain
- Power coordination in progressPower availability and delivery timing remain subject to Dominion Energy planning and approvals
- Environmental diligence underwayPhase I ESA in progress; Phase II only if recommended
- Single-owner land positionSingle owner · 4,041 contiguous acres
- Flexible parcel configuration50-acre campus pods to 1,000+ acre single-tenant
- Fiber pathway under evaluationCarrier selection and route diversity require provider confirmation
- Potential project-specific Virginia incentivesEligibility must be confirmed with legal and tax advisors
- Potential transaction structures subject to owner agreementTransaction terms are negotiable and not represented as committed
Available for Diligence Review
Available technical and legal materials may be reviewed by qualified parties under NDA.
- · Title report & ownership chain
- · Survey & metes & bounds
- · Deed restrictions review
- · Easements mapping
- · Zoning confirmation letter
- · Power capacity diligence
- · Phase 1 power planning materials
- · Available fiber planning materials
- · Water and sewer extension engineering materials
- · Available access and transportation materials
- · Phase I ESA report
- · Phase II ESA, if recommended
- · Wetlands delineation
- · Available floodplain mapping
- · FEMA FIRM map extract
Start Your Due Diligence Today
Qualified parties may request an NDA and data-room access for detailed review.