Data Center · Praetorian Park

Data & Technology Within a Broader Mixed-Use Campus

Whether you need a Phase 1 campus today or a multi-gigawatt sovereign deployment over a decade, Praetorian Park's infrastructure, entitlements, and site scale accommodate every hyperscale data center configuration.

Active
Phase 1 Power
Planning and capacity diligence
5+
GW Total
Full campus potential
4,041
Acres
Contiguous · subdivisible
Confirmed zoning
By Right
No re-zoning required
Phase 1 vs Full Buildout

Start Fast. Scale Without Limits.

Phase 1 delivers immediate power and operational capability. The full buildout positions Praetorian Park as one of the largest single-campus data center deployments in North America.

Phase 1
Immediate Deployment
Active
Phase 1 Power
  • ✓ Phase 1 power planning active; no substation exists on site today
  • ✓ Transmission configuration requires utility confirmation
  • ✓ Confirmed zoning zoning · data center by right
  • ✓ Phase I ESA in progress; Phase II only if recommended
  • ✓ Regional access associated with US-17 and Ballahack Road; entrances and load limits require confirmation
  • ✓ Water and sewer extension engineering documented; commitments remain planned
  • ✓ Fiber provider pathway identified; carriers and routes require confirmation
  • ✓ 18–24 month path to energization
ActiveUtility Planning
Full Buildout
Hyperscale Campus
5+
GW · Full Potential
  • ✓ 4,041 contiguous acres; subdivision and parcel configuration subject to planning and approvals
  • ✓ Future electrical facilities subject to engineering and utility coordination
  • ✓ On-site generation optionality (gas, SMR, renewable)
  • ✓ Multi-tenant or single-operator campus
  • ✓ Sovereign / defense campus capable
  • ✓ Parcel configurations are conceptual and subject to planning and approvals
  • ✓ Fee-simple or ground lease structures
  • ✓ Long-term power purchase agreement capable
Long-TermGeneration Optionality
Zoning & Power

No Queue. No Variance. No Delay.

Praetorian Park eliminates the two most common hyperscale development blockers: zoning uncertainty and power queue uncertainty. Both are resolved before you arrive.

Power Delivery
Active

Phase 1 power planning and capacity diligence are active. No committed 300 MW delivery or existing on-site substation is represented.

Path to 5+ GW
Phase 1: ActiveFull: 5+ GW
Grid Connection
PJM Interconnection

PJM is the regional transmission organization. Procurement structures, interconnection, tariffs, PPAs, and renewable options require project-specific utility and legal review.

Zoning
Confirmed zoning
Zoning Confirmed
BY RIGHT
Industrial & Data

Industrial and data uses are permitted by right under the confirmed zoning. A discretionary rezoning or special-use vote is not required for those uses; site-plan review, permits, utility coordination, environmental review, and other approvals remain.

Fiber Access
  • Zayo Group — US-17 corridor · on-site conduit
  • Lumen / CenturyLink — long-haul backbone
  • Provider option — route and availability to be confirmed
  • Comcast Enterprise — regional ring
Site Advantages

Six Reasons Operators Choose Praetorian Park

Beyond power and zoning, the site's physical and jurisdictional profile creates advantages that compound through the development and operations lifecycle.

Phased Power Planning
Phase 1 power planning is active and Phase 2 is planned. The long-term buildout potential is 5+ GW, subject to engineering, utility coordination, agreements, and approvals.
📍
DC Corridor Proximity
Approximately 180 minutes from Northern Virginia. Fiber routes, latency, carrier diversity, and delivery schedules require provider confirmation.
By-Right Zoning
Confirmed zoning zoning is confirmed for industrial and data uses by right. A discretionary City Council rezoning or special-use vote is not required for those uses; site-plan, permit, utility, environmental, and other applicable approvals remain.
📐
True Campus Scale
The site is represented as 4,041 contiguous acres under single ownership. Parcel configuration, subdivision, title, easements, and encumbrances require current diligence.
🏛
Virginia Tax Advantage
Potential tax and incentive eligibility is project-specific and should be confirmed with the City and qualified legal and tax advisors.
🛡
Sovereign / Defense Capable
Hampton Roads' military and federal presence contributes to the regional economy and workforce; suitability for government or defense workloads requires project-specific review.
Technical Specifications

Data Center Site Specs

Key parameters for engineering review, site selection, and due diligence.

ParameterPhase 1Full Buildout
Power CapacityActive planning5+ GW potential
Transmission ProviderDominion Energy corridor pathway · no existing on-site substation
Grid ConnectionPJM Interconnection
Site AcreagePhase 1 parcel (TBD by operator)4,041 acres total · contiguous
Parcel Min / MaxParcel size and configuration subject to planning, subdivision, and approvals
ZoningConfirmed zoning · industrial and data uses by right · City of Chesapeake
Fiber AccessProvider pathway identified; carriers, routes, diversity, and timing require confirmation
Water SourceCity-engineered water and sewer extensions planned; no tidal cooling approval or committed capacity represented
Road AccessUS-17 & Ballahack Rd · dual heavy-haul arterials
Time to First Power18–24 months from closingPhased · demand-driven
Generation OptionalityGrid-sourcedGas / SMR / renewable hybrid
Deal StructuresFee-simple · Ground lease · Build-to-suit · JV
Environmental StatusPhase I ESA in progress · Phase II only if recommended
Site Imagery

Campus Layouts & Site Maps

Full site imagery, layout diagrams, and buildout maps available under NDA.

Image Slot
Phase 1 campus layout diagram
Buildable areas · planned electrical concepts · access roads · parcel boundary
Image Slot
Full buildout layout — 5+ GW
Pitch deck p.12 — all campus parcels + power zones

Request Data Center Package

Available site plans, power diligence, zoning confirmation, and technical materials may be reviewed under NDA.