Infrastructure · Praetorian Park

Two Complementary Power Paths and a Regional Fiber Strategy

Praetorian Park is advancing infrastructure planning for a diverse innovation campus. The strategy evaluates both Dominion Energy grid delivery and behind-the-meter solutions, while carrier coordination advances potential fiber connections into Chesapeake and the broader Southside regional network.

In ProgressPhase 1 power planning
Two PathsDominion + behind the meter
In ProgressCarrier coordination
5+ GWLong-term buildout potential
Power Strategy

Grid Delivery and Behind-the-Meter Optionality

The two pathways can be evaluated independently or in combination as campus demand, engineering, commercial structures, permitting, and schedules become clearer. Neither path should be read as a completed facility or committed capacity.

Dominion Energy / Grid Path

Dominion Energy is the primary utility counterpart for grid access. Work includes capacity diligence, potential delivery corridors, required utility facilities, interconnection sequencing, and phased service planning.

  • Phase 1 planning and utility coordination are in progress.
  • No existing on-site substation or committed delivery schedule is represented.
  • Facilities, easements, agreements, engineering, and regulatory steps remain.
In progress

Behind-the-Meter Path

Praetorian Park is also evaluating behind-the-meter infrastructure that could complement grid service and support resilience, phasing, and tenant-specific requirements.

  • Potential concepts include on-site generation, energy storage, microgrid controls, and load-management systems.
  • Technology mix, fuel supply, emissions, water needs, permits, commercial structure, and economics require project-specific study.
  • This is a planning pathway, not an existing generating facility or executed energy agreement.
Feasibility pathway
Development Sequence

Power Planning by Phase

Phase 1 · In Progress

Initial Power & Infrastructure Planning

Capacity diligence, utility coordination, behind-the-meter evaluation, and tenant-load planning are underway. Confirmed PUD-IN zoning permits industrial and data uses by right; administrative reviews and permits still apply.

Phase 2 · Planned

Expansion Following Phase 1

Scope and timing will follow Phase 1 findings, actual demand, utility and behind-the-meter feasibility, engineering, and commercial commitments.

Long Term · Potential

5+ GW Buildout Potential

The 5+ GW figure describes long-term phased potential. It is not current service, reserved capacity, or an executed utility commitment.

Fiber Connectivity

Carrier Coordination and Regional Interconnection

Carrier work is in progress. The current pathway contemplates connections into Chesapeake Connects - the City network described in the supplied master plan as the Chesapeake Next Generation Network (C-NGN) - and the Southside Network Authority Regional Connectivity Ring (SNA-RCR), subject to route engineering, access rights, capacity, agreements, and schedule.

Chesapeake Connects

The City master plan describes an underground, high-capacity municipal backbone intended to interconnect public facilities, adjacent city networks, commercial data centers, and regional infrastructure. Site access is not represented as complete.

Southside Regional Network

The master plan identifies resilient connections to the SNA-RCR and regional subsea connectivity as strategic objectives. The supplied regional-loop map illustrates that broader regional context.

Carrier Pathways

Supplied Zayo, Lumen, and Segra materials show regional network presence or route context. Carrier selection, lateral construction, diversity, lit or dark-fiber products, pricing, and delivery dates remain in progress and require provider confirmation.

Fiber Mapping

Chesapeake and Hampton Roads Network Context

The maps below are public-facing orientation exhibits supplied for planning. They do not represent an executed service agreement, completed site lateral, guaranteed route, capacity, diversity, latency, or delivery date.

Chesapeake municipal fiber backbone planning map
Chesapeake LoopMunicipal backbone planning context showing facilities and routes across the city.
Southside regional fiber loop map
Southside Regional LoopRegional connectivity context across South Hampton Roads and neighboring jurisdictions.
Lumen network map for Virginia and Hampton Roads
Lumen Regional Network ContextProvider-supplied network view. Exact availability and connection to the site require Lumen confirmation.
Segra fiber network map for Hampton Roads
Segra Regional Network ContextProvider-supplied network view. Exact routes, products, and site delivery require Segra confirmation.

The 2026 Zayo network mapbook also identifies Virginia Beach within Zayo's North American network context. The supplied mapbook is evidence of regional network presence, not an executed Praetorian Park connection.

Current Infrastructure Status

What Is Confirmed, In Progress, and Planned

WorkstreamStatusPublic Description
Dominion grid pathIn progressCapacity diligence and utility coordination; no on-site substation or committed schedule represented.
Behind-the-meter pathUnder evaluationGeneration, storage, controls, and resilience concepts subject to feasibility and approvals.
Phase 1 powerIn progressInitial power and infrastructure planning.
Phase 2 powerPlannedScope follows Phase 1 findings and demand.
Fiber carriersIn progressCarrier coordination and route development; no executed site service agreement represented.
Chesapeake/Southside interconnectionPathway identifiedPotential connection to Chesapeake Connects/C-NGN and SNA-RCR, subject to technical and commercial confirmation.
Water and sewerPlannedExtension engineering is documented; construction and capacity commitments remain future work.
Qualified Review

Request Infrastructure Information

Qualified parties may request available power, fiber, utility, and engineering materials at the appropriate stage of a project discussion.